/ 详情

[openEuler 20.03 LTS SP1/X86_64] LTP 测试用例 ftruncate04_64执行失败

Done
Task
Opened this issue  
2021-04-21 15:17

【标题描述】能够简要描述问题:说明什么场景下,做了什么操作,出现什么问题(尽量使用正向表达方式)
【环境信息】
硬件信息:
1) 裸机场景提供出问题的硬件信息;
2) 虚机场景提供虚机XML文件或者配置信息
[root@hulk-34 bin]# lscpu
Architecture: x86_64
CPU op-mode(s): 32-bit, 64-bit
Byte Order: Little Endian
Address sizes: 46 bits physical, 48 bits virtual
CPU(s): 40
On-line CPU(s) list: 0-39
Thread(s) per core: 2
Core(s) per socket: 10
Socket(s): 2
NUMA node(s): 2
Vendor ID: GenuineIntel
CPU family: 6
Model: 85
Model name: Intel(R) Xeon(R) Silver 4114 CPU @ 2.20GHz
Stepping: 4
软件信息:
1) OS版本及分支
cat /etc/openEuler-release
openEuler release 20.03 (LTS-SP1)
2) 内核信息
4.19.90
3) 发现问题的组件版本信息
如果有特殊组网,请提供网络拓扑图
【问题复现步骤】
具体操作步骤
cd /home/install/kernel_test_bin/bin/ltp/testcases/bin
./ftruncate04_64
出现概率(是否必现,概率性错误)
【预期结果】
pass
【实际结果】
[root@hulk-34 bin]# ./ftruncate04_64
tst_device.c:89: TINFO: Found free device 0 '/dev/loop0'
tst_test.c:859: TINFO: Formatting /dev/loop0 with ext2 opts='' extra opts=''
mke2fs 1.45.6 (20-Mar-2020)
tst_test.c:1263: TINFO: Timeout per run is 0h 05m 00s
ftruncate04.c:162: TCONF: Mandatory lock not supported by this system

Summary:
passed 0
failed 0
broken 0
skipped 1
warnings 0
【附件信息】
比如系统message日志/组件日志、dump信息、图片等

Attachments

Comments (2)

汪可可 created任务
汪可可 set related repository to openEuler/kernel
展开全部操作日志

Hey wang_keke, Welcome to openEuler Community.
All of the projects in openEuler Community are maintained by @openeuler-ci-bot .
That means the developers can comment below every pull request or issue to trigger Bot Commands.
Please follow instructions at https://gitee.com/openeuler/community/blob/master/en/sig-infrastructure/command.md to find the details.

#I3NEOG:[openEuler 20.03 LTS SP1/X86_64] LTP 测试用例ftruncate04执行失败

该用例需要 CONFIG_MANDATORY_FILE_LOCKING 支持。
当前 X86 默认未开启该功能。

开启 CONFIG_MANDATORY_FILE_LOCKING 后,测试。
用例通过

成坚 (CHENG Jian) translation missing: en.project.new_issues_operate_log.link_issue(Normal)[openEuler 20.03 LTS SP1/X86_64] LTP 测试用例ftruncate04执行失败
成坚 (CHENG Jian) changed issue state from 待办的 to 已完成

Sign in to comment

状态
Assignees
Projects
Milestones
Pull Requests
关联的 Pull Requests 被合并后可能会关闭此 issue
Branches
Planed to start   -   Planed to end
-
Top level
Priority
Duration (hours)
确定
参与者(3)
5329419 openeuler ci bot 1578984659